2018

Railway bridge, prefabricated, two 33-meter spans, as the overpass of the highway in Saudi Arabia. One of the bridges of the new high-speed connection between Damam and Jubail.

 

The peculiarity of the bridge lies in the greatly increased freight of the freight train, as well as the high speed of 250 km/h. The abutments and the central pier of the bridge were founded with piles. The T-beams, 33 meters long and 2.5 meters high, were manufactured and post tensioned on site before being brought to their final position.

Find the full project presentation here.

Share this

cubus engineering

cubus engineering
7, Themistokli Sofouli Str.

154 51, Neo Psychiko
Athens, Greece

Contact Information
_______________________

Web: https://cubushellas.gr
Email: cubusengineering@gmail.com
Tel.: 0030 210 6722360, 366, 389, 382